Files
devops-it-manual/monitoring/ARCHITECTURE.md
T

12 KiB
Raw Blame History

Chapter 5 — Monitoring Architecture and Recovery Plan

Project: SSW 590 DevOps — Group 10 Repository: group10-startup/devops-it-manual Tracking issue: #1 Preparation branch: chapter5-sre-monitoring Prepared: October 28, 2026 Status: Proposed architecture — not deployed or verified

  1. Objective

Extend the existing Group 10 DevOps infrastructure with a reproducible monitoring system using Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter.

The system must monitor the Linux host’s CPU, available memory, and root filesystem capacity, as well as the HTTPS availability and response duration of Gitea and Jenkins.

The implementation must preserve the existing Gitea, Jenkins, Caddy, repositories, Jenkins pipelines, Gitea Actions workflows, and persistent application data.

  1. Verified Infrastructure Baseline

Baseline recorded on October 28, 2026, at 22:18:12 UTC.

Component Verified value Hostname sergio-ssw590-gitea Primary Droplet IPv4 165.227.90.215 Operating system Ubuntu 24.04.4 LTS CPU 1 vCPU Total RAM 458 MiB Available RAM 209 MiB Swap 1 GiB; 633 MiB used Root filesystem /dev/vda1 Root filesystem capacity 8.7 GB Available root disk 3.3 GB Root disk utilization 63% Docker 29.8.1 Docker Compose v5.5.1

Existing containers at baseline:

Container Image Status Observed memory Gitea gitea/gitea:1.27.3 Running 88.78 MiB Jenkins jenkins/jenkins:2.528.1-lts-jdk21 Running 51.77 MiB Caddy caddy:2.10.2 Running 12.29 MiB

These resource measurements represent one observation, not peak consumption during Jenkins builds.

Docker storage at baseline:

  • Images: 1.17 GB
  • Containers: 245.7 MB
  • Local volumes: 12.78 kB
  • Build cache: 0 B
  1. Capacity Constraint and Deployment Decision

The existing Droplet has insufficient memory headroom for a typical deployment of four additional monitoring containers alongside Jenkins, Gitea, and Caddy.

Deployment is blocked until capacity is assessed and an architecture is approved.

The team must:

  1. Measure resource consumption during a representative Jenkins build.
  2. Inspect the second existing DigitalOcean Droplet (159.223.171.15) without changing its configuration.
  3. Compare the cost and operational consequences of resizing the existing Droplet versus using another monitoring host.
  4. Confirm adequate memory, disk capacity, and monitoring retention.
  5. Record the selected deployment architecture and its justification.

The preferred design is a single appropriately sized Linux host. If monitoring runs on another host, Node Exporter must still report the intended Gitea/Jenkins Droplet’s resources, and the network architecture must be documented accurately.

No Droplet resizing, new paid resources, or additional services should be provisioned without team approval.

  1. Proposed Logical Architecture

The following diagram represents the preferred single-host design. It is not an as-built diagram.

                  Internet / Team Browser
                            |
                       HTTPS :443
                            |
                     Caddy Reverse Proxy
                      /       |       \
                     /        |        \
                  Gitea     Jenkins    Grafana
                   |           |          |
             Git repositories  CI      Dashboards
                   |           |       and alerts
                   +-----------+----------+
                               |
                     Private Docker Networks
                               |
                          Prometheus
                        /     |      \
                       /      |       \
               Prometheus   Node      Blackbox
               self-scrape  Exporter  Exporter
                              |          |
                         Host CPU,    HTTPS probes
                         RAM, disk    of Gitea and
                                      Jenkins

Prometheus collects metrics and probe results at a proposed 30-second interval.

Grafana queries Prometheus for dashboard visualization and evaluates Grafana-managed alert rules.

Node Exporter collects Linux host metrics.

Blackbox Exporter probes the externally accessible HTTPS endpoints of Gitea and Jenkins.

Caddy provides authenticated HTTPS access to Grafana through a dedicated hostname.

The final diagram must be updated to match the actual deployment, including Docker networks, service ports, storage, and any cross-host communication.

  1. Required Monitoring Components

Component Image repository Function Prometheus prom/prometheus Time-series metric collection Grafana OSS grafana/grafana Dashboards and managed alerts Node Exporter quay.io/prometheus/node-exporter Linux host metrics Blackbox Exporter quay.io/prometheus/blackbox-exporter HTTPS availability and latency

Before deployment, Sergio must select supported, fixed image tags and record the pulled image digests.

Do not use floating latest tags.

  1. Networking and Access Control

Public access

  • Caddy: HTTPS port 443 and HTTP port 80 where needed for redirection and certificate management.
  • Gitea: HTTPS through Caddy.
  • Jenkins: HTTPS through Caddy.
  • Grafana: HTTPS through Caddy using a dedicated hostname and authenticated login.

Private services

The following monitoring ports must not be publicly accessible:

  • Prometheus: 9090
  • Node Exporter: 9100
  • Blackbox Exporter: 9115

Grafana’s internal port 3000 must also remain private.

Jenkins backend port 8080 and Gitea backend port 3000 must not be exposed directly to the public internet.

Docker networks and host firewall rules must restrict access appropriately. Validate public exposure from an external machine, including IPv6 where applicable.

Credentials

Store Grafana administrator credentials, notification secrets, and other sensitive values outside version-controlled files.

Do not include passwords, tokens, private webhook URLs, or SSH keys in the repository, screenshots, or final manual.

  1. Persistent Storage and Retention

Prometheus must use persistent storage for its time-series database.

Grafana must use persistent storage for its application database and state.

A seven-day Prometheus retention period is proposed, subject to actual available disk capacity.

Version-control sanitized configuration, dashboard definitions, data-source provisioning, and alert-rule definitions.

Persistent Docker volumes must not be deleted during ordinary container restarts or troubleshooting.

Do not use docker compose down -v as a normal recovery command.

  1. Required Dashboard

The dashboard must contain exactly six core panels:

  1. Whole-host CPU utilization percentage, averaged across CPUs.
  2. Available host memory.
  3. Available root filesystem percentage.
  4. Gitea HTTPS probe success, displayed as 0 or 1.
  5. Jenkins HTTPS probe success, displayed as 0 or 1.
  6. HTTPS probe duration for both services in seconds.

Use appropriate units, legends, thresholds, time zone, and default time range.

Verify the dashboard against live metrics after deployment.

  1. Required Reliability Objectives

Define HTTPS probe success as the service availability SLI.

Use a 99% success objective over a 24-hour window as the exercise SLO.

Clearly distinguish:

  • SLI: measured reliability indicator.
  • SLO: internal reliability target.
  • SLA: contractual reliability commitment; none is established by this exercise.

Complete both the supplied hypothetical calculations and a short actual observation window that includes the controlled Jenkins outage.

Missing probe samples must not automatically be counted as successful requests.

  1. Required Alerting

Service availability

A Grafana-managed alert must detect sustained HTTPS probe failure for Gitea or Jenkins, with a pending duration of at least one minute.

Host disk capacity

A Grafana-managed alert must detect root filesystem free space below 15% for five minutes.

Both alerts require:

  • Rule owner and severity.
  • Query and threshold.
  • Evaluation interval and pending duration.
  • No-data and error handling.
  • Notification destination.
  • Runbook.
  • Evidence of firing, notification delivery, and resolution.

Test the disk alert by temporarily increasing the threshold above actual free space, then restore the final 15% threshold.

Never fill the disk intentionally to trigger the alert.

  1. Controlled Incident Plan

The team must schedule a controlled Jenkins outage of approximately three minutes.

Before the test:

  1. Confirm no Jenkins build is running.
  2. Record the current service status.
  3. Confirm the exact Jenkins stop and restart commands.
  4. Confirm monitoring and notifications are operational.
  5. Agree on a maintenance window.

During the test:

  1. Record the UTC time when Jenkins is stopped.
  2. Record the first unsuccessful HTTPS probe.
  3. Record alert firing and notification receipt.
  4. Record acknowledgment.
  5. Restart Jenkins after approximately three minutes.
  6. Record the first successful probe.
  7. Record alert resolution.

After the test:

  1. Verify Jenkins HTTPS access.
  2. Run a successful Jenkins pipeline.
  3. Verify Gitea remains available.
  4. Verify the Gitea Actions manual PDF workflow.
  5. Restart Prometheus and Grafana individually without deleting persistent storage.
  6. Confirm earlier time-series data, dashboard configuration, and alert rules persist.
  7. Complete a blameless incident review.
  8. Create two improvement issues with assigned owners.

The incident must not interrupt Gitea intentionally.

  1. Rollback and Recovery Plan

Before deployment

  • Record the existing running containers and versions.
  • Identify current Compose projects, networks, mounts, and configuration locations.
  • Confirm the recovery procedure for Gitea, Jenkins, and Caddy.
  • Preserve existing application data and backups.
  • Record the monitoring configuration commit.
  • Confirm adequate capacity.

If monitoring deployment fails

  1. Stop or remove only the newly introduced monitoring containers as appropriate.
  2. Preserve Prometheus and Grafana persistent volumes.
  3. Restore the previously verified monitoring configuration.
  4. Confirm Gitea, Jenkins, and Caddy remain operational.
  5. Verify external HTTPS access to Gitea and Jenkins.
  6. Record the failure, corrective action, and result in the Gitea issue.

If an existing service is affected

  1. Stop the monitoring rollout.
  2. Identify the affected service and its current status.
  3. Follow the service-specific recovery procedure.
  4. Avoid deleting or recreating existing application data.
  5. Verify HTTPS availability and application functionality.
  6. Record the recovery timeline.

Rollback commands must be finalized against the actual Docker deployment before use.

  1. Monitoring Failure Domain

If monitoring and monitored services run on the same Droplet, a complete Droplet outage may also disable Prometheus, Grafana, and alert delivery.

This is a shared failure domain.

The final incident review should recommend an independent external uptime check as a prioritized improvement.

  1. Evidence and Traceability

The final manual must include:

  • Approved deployment architecture and capacity decision.
  • Pinned image versions and digests.
  • Configuration validation results.
  • Deployment commands and container status.
  • Prometheus target and host-metric verification.
  • HTTPS/TLS and external exposure checks.
  • Six-panel Grafana dashboard.
  • Jenkins build correlation.
  • SLI/SLO calculations and actual observation results.
  • Alert firing, notification, and resolution evidence.
  • Controlled incident timeline and recovery verification.
  • Persistence test results.
  • Two improvement issues with owners.
  • Reviewed Gitea commits and successful PDF workflow run.

Do not describe planned or untested behavior as verified.

  1. Handoff Responsibilities

Turan — preparation: Architecture, proposed configuration, dashboard definitions, hypothetical calculations, alert and incident procedures, and initial manual documentation.

Sergio — implementation: Capacity approval, deployment, networking, security, persistence, live verification, alert testing, controlled incident, evidence collection, final manual updates, reviewed merge, and PDF submission.

Current status: Preparation only. Monitoring deployment and operational verification remain pending.