# Chapter 6 — Release Operations Runbook ## 1. Purpose Document the controlled release procedure for the Startup Pricing Service using Jenkins, Docker, the Gitea OCI registry, Ansible, and Docker Compose. This runbook covers the promotion of an approved application release from staging to production-like deployment. All releases must preserve the existing Gitea, Jenkins, Caddy, and Chapter 5 monitoring infrastructure. ## 2. Roles and Responsibilities | Role | Responsibility | |---|---| | Developer | Prepare and review application changes | | Jenkins | Execute tests, security gates, build, and delivery stages | | Trusted Jenkins agent | Execute approved build and deployment operations | | Release approver | Authorize production promotion | | Deployment operator | Investigate failures and execute recovery procedures | For this assignment, Sergio will configure and execute the delivery workflow. Actual production approval must be performed by an authorized person through Jenkins and recorded in the release evidence. ## 3. Preconditions Before starting a release: 1. Confirm that the proposed changes have been reviewed. 2. Confirm that the release originates from protected `main`. 3. Confirm that the trusted Jenkins agent is available. 4. Confirm that Jenkins credentials are correctly restricted. 5. Confirm that Docker and Ansible are operational. 6. Confirm that the Gitea OCI registry is accessible. 7. Confirm that staging and production HTTPS endpoints are configured. 8. Confirm that the previous approved release is available for rollback. 9. Confirm that existing infrastructure is healthy. 10. Record the current application version and image digest. Do not begin a privileged deployment from an untrusted pull-request build. ## 4. Source and Build Verification The Jenkins pipeline must: 1. Check out the reviewed application source. 2. Record the full Git commit identifier. 3. Verify the Python interpreter version. 4. Run Python syntax checks. 5. Install the approved dependency set. 6. Execute the application unit tests. 7. Stop immediately if any required test fails. The build must use the approved Python base-image digest and reproducible dependency versions. ## 5. Security Gates Before release, execute: - Python dependency vulnerability scanning. - Source-code secret scanning. - Container image vulnerability scanning. Record the scanner versions, vulnerability database information, timestamps, results, and exit codes. Any required scanner failure, unavailable vulnerability database, or unapproved high/critical vulnerability must block release. Never bypass a failed security gate to continue deployment. ## 6. Container Image Publication After successful tests and security checks: 1. Build the application container image once. 2. Include the full application source commit in the image. 3. Tag the image using the approved registry naming convention. 4. Authenticate using protected Jenkins credentials. 5. Push the image to the Gitea OCI registry. 6. Retrieve its immutable repository digest. 7. Record the digest in the release traceability document. Do not use a mutable image tag as the deployment identity. ## 7. Staging Deployment Use Ansible to deploy the approved immutable image to staging. Before deployment: 1. Confirm the staging release record contains no placeholders. 2. Confirm the image digest matches the published image. 3. Confirm the deployment configuration commit is recorded. 4. Validate the Ansible playbook syntax. 5. Confirm the target is staging. Deploy using the approved staging release record. The deployment must not rebuild the application image. ## 8. Staging Verification After deployment, verify: | Check | Expected Result | |---|---| | HTTPS certificate | Valid | | `/health` | HTTP 200 and status `ok` | | `/` | Correct version and source commit | | `/price?quantity=3` for v1 | USD 30 | | `/price?quantity=3` for v2 | USD 36 | | Deployed image digest | Matches approved release digest | Capture the Ansible output and HTTPS verification evidence. If any check fails, stop the pipeline and follow the recovery runbook. ## 9. Production Approval Production promotion requires a restricted Jenkins approval step. The approval must: 1. Display the release version and immutable image digest. 2. Identify the staging verification result. 3. Require an authorized approver. 4. Enforce an approval timeout. 5. Record the actual approver and approval timestamp. A rejected or expired approval must block production deployment. Do not fabricate approval evidence. ## 10. Production Deployment After approval: 1. Select the approved production release record. 2. Verify that it uses the identical image digest as staging. 3. Record the deployment configuration commit. 4. Execute the production Ansible deployment. 5. Wait for application health verification. 6. Confirm the production HTTPS endpoint is reachable. The production deployment must not rebuild the image. ## 11. Production Verification Verify the following: - HTTPS certificate validation succeeds. - `/health` returns HTTP 200 and status `ok`. - `/` returns the approved application version. - `/` returns the expected application source commit. - `/price?quantity=3` returns the expected total. - The deployed repository digest matches the staging digest. - Existing infrastructure remains operational. Record the production deployment timestamp and verification evidence. ## 12. Release Traceability Update: `secure-delivery/releases/RELEASE_TRACEABILITY.md` Record: - Application version. - Source commit. - Deployment configuration commit. - Jenkins build number and URL. - Dependency and base-image versions. - Security scan results. - Published image digest. - Staging verification. - Production approver and approval time. - Production verification. - Evidence links. All values must be obtained from actual execution. ## 13. Failed Release Handling If a required stage fails: 1. Stop the release workflow. 2. Record the failed stage and timestamp. 3. Preserve relevant logs. 4. Confirm that production has not been unintentionally modified. 5. Determine whether staging recovery is necessary. 6. Follow the rollback and recovery runbook when applicable. 7. Correct the underlying problem in a reviewed commit. 8. Rerun the required tests and security gates. Do not silently retry an unsafe deployment or bypass failed checks. ## 14. Post-Release Monitoring After a successful production deployment: 1. Confirm the production HTTPS Blackbox probe is successful. 2. Confirm Prometheus receives the expected metrics. 3. Confirm the production application is visible in Grafana. 4. Record the deployment timestamp. 5. Compare monitoring observations with the release timeline. Preserve all existing Chapter 5 monitoring targets. ## 15. Completion Criteria A release is complete only when: - Required tests pass. - Required security gates pass. - The image is published and its digest recorded. - Staging deployment and verification succeed. - Production approval is recorded. - Production uses the identical approved image digest. - Production verification succeeds. - Monitoring remains operational. - Release evidence is documented. ## 16. Status Release operations runbook prepared. Actual execution, infrastructure configuration, approval, and supporting evidence remain pending Sergio's implementation.