Files
devops-it-manual/monitoring/ARCHITECTURE.md
2026-10-30 21:28:50 +00:00

373 lines
16 KiB
Markdown

Chapter 5 — Monitoring Architecture and Recovery Plan
Project: SSW 590 DevOps — Group 10
Repository: group10-startup/devops-it-manual
Tracking issue: #1
Preparation branch: chapter5-sre-monitoring
Prepared: October 28, 2026
Status: Proposed architecture — not deployed or verified
1. Objective
Extend the existing Group 10 DevOps infrastructure with a reproducible monitoring system using Prometheus, Grafana OSS, Node Exporter, and Blackbox Exporter.
The system must monitor the Linux host’s CPU, available memory, and root filesystem capacity, as well as the HTTPS availability and response duration of Gitea and Jenkins.
The implementation must preserve the existing Gitea, Jenkins, Caddy, repositories, Jenkins pipelines, Gitea Actions workflows, and persistent application data.
2. Verified Infrastructure Baseline
Baseline recorded on October 28, 2026, at 22:18:12 UTC.
Component Verified value
Hostname sergio-ssw590-gitea
Primary Droplet IPv4 165.227.90.215
Operating system Ubuntu 24.04.4 LTS
CPU 1 vCPU
Total RAM 458 MiB
Available RAM 209 MiB
Swap 1 GiB; 633 MiB used
Root filesystem /dev/vda1
Root filesystem capacity 8.7 GB
Available root disk 3.3 GB
Root disk utilization 63%
Docker 29.8.1
Docker Compose v5.5.1
Existing containers at baseline:
Container Image Status Observed memory
Gitea gitea/gitea:1.27.3 Running 88.78 MiB
Jenkins jenkins/jenkins:2.528.1-lts-jdk21 Running 51.77 MiB
Caddy caddy:2.10.2 Running 12.29 MiB
These resource measurements represent one observation, not peak consumption during Jenkins builds.
Docker storage at baseline:
* Images: 1.17 GB
* Containers: 245.7 MB
* Local volumes: 12.78 kB
* Build cache: 0 B
3. Capacity Constraint and Deployment Decision
The existing Droplet has insufficient memory headroom for a typical deployment of four additional monitoring containers alongside Jenkins, Gitea, and Caddy.
Deployment is blocked until capacity is assessed and an architecture is approved.
The team must:
1. Measure resource consumption during a representative Jenkins build.
2. Inspect the second existing DigitalOcean Droplet (159.223.171.15) without changing its configuration.
3. Compare the cost and operational consequences of resizing the existing Droplet versus using another monitoring host.
4. Confirm adequate memory, disk capacity, and monitoring retention.
5. Record the selected deployment architecture and its justification.
The preferred design is a single appropriately sized Linux host. If monitoring runs on another host, Node Exporter must still report the intended Gitea/Jenkins Droplet’s resources, and the network architecture must be documented accurately.
No Droplet resizing, new paid resources, or additional services should be provisioned without team approval.
4. Proposed Logical Architecture
The following diagram represents the preferred single-host design. It is not an as-built diagram.
Internet / Team Browser
|
HTTPS :443
|
Caddy Reverse Proxy
/ | \
/ | \
Gitea Jenkins Grafana
| | |
Git repositories CI Dashboards
| | and alerts
+-----------+----------+
|
Private Docker Networks
|
Prometheus
/ | \
/ | \
Prometheus Node Blackbox
self-scrape Exporter Exporter
| |
Host CPU, HTTPS probes
RAM, disk of Gitea and
Jenkins
Prometheus collects metrics and probe results at a proposed 30-second interval.
Grafana queries Prometheus for dashboard visualization and evaluates Grafana-managed alert rules.
Node Exporter collects Linux host metrics.
Blackbox Exporter probes the externally accessible HTTPS endpoints of Gitea and Jenkins.
Caddy provides authenticated HTTPS access to Grafana through a dedicated hostname.
The final diagram must be updated to match the actual deployment, including Docker networks, service ports, storage, and any cross-host communication.
5. Required Monitoring Components
Component Image repository Function
Prometheus prom/prometheus Time-series metric collection
Grafana OSS grafana/grafana Dashboards and managed alerts
Node Exporter quay.io/prometheus/node-exporter Linux host metrics
Blackbox Exporter quay.io/prometheus/blackbox-exporter HTTPS availability and latency
Before deployment, Sergio must select supported, fixed image tags and record the pulled image digests.
Do not use floating latest tags.
6. Networking and Access Control
Public access
* Caddy: HTTPS port 443 and HTTP port 80 where needed for redirection and certificate management.
* Gitea: HTTPS through Caddy.
* Jenkins: HTTPS through Caddy.
* Grafana: HTTPS through Caddy using a dedicated hostname and authenticated login.
Private services
The following monitoring ports must not be publicly accessible:
* Prometheus: 9090
* Node Exporter: 9100
* Blackbox Exporter: 9115
Grafana’s internal port 3000 must also remain private.
Jenkins backend port 8080 and Gitea backend port 3000 must not be exposed directly to the public internet.
Docker networks and host firewall rules must restrict access appropriately. Validate public exposure from an external machine, including IPv6 where applicable.
Credentials
Store Grafana administrator credentials, notification secrets, and other sensitive values outside version-controlled files.
Do not include passwords, tokens, private webhook URLs, or SSH keys in the repository, screenshots, or final manual.
7. Persistent Storage and Retention
Prometheus must use persistent storage for its time-series database.
Grafana must use persistent storage for its application database and state.
A seven-day Prometheus retention period is proposed, subject to actual available disk capacity.
Version-control sanitized configuration, dashboard definitions, data-source provisioning, and alert-rule definitions.
Persistent Docker volumes must not be deleted during ordinary container restarts or troubleshooting.
Do not use docker compose down -v as a normal recovery command.
8. Required Dashboard
The dashboard must contain exactly six core panels:
1. Whole-host CPU utilization percentage, averaged across CPUs.
2. Available host memory.
3. Available root filesystem percentage.
4. Gitea HTTPS probe success, displayed as 0 or 1.
5. Jenkins HTTPS probe success, displayed as 0 or 1.
6. HTTPS probe duration for both services in seconds.
Use appropriate units, legends, thresholds, time zone, and default time range.
Verify the dashboard against live metrics after deployment.
9. Required Reliability Objectives
Define HTTPS probe success as the service availability SLI.
Use a 99% success objective over a 24-hour window as the exercise SLO.
Clearly distinguish:
* SLI: measured reliability indicator.
* SLO: internal reliability target.
* SLA: contractual reliability commitment; none is established by this exercise.
Complete both the supplied hypothetical calculations and a short actual observation window that includes the controlled Jenkins outage.
Missing probe samples must not automatically be counted as successful requests.
10. Required Alerting
Service availability
A Grafana-managed alert must detect sustained HTTPS probe failure for Gitea or Jenkins, with a pending duration of at least one minute.
Host disk capacity
A Grafana-managed alert must detect root filesystem free space below 15% for five minutes.
Both alerts require:
* Rule owner and severity.
* Query and threshold.
* Evaluation interval and pending duration.
* No-data and error handling.
* Notification destination.
* Runbook.
* Evidence of firing, notification delivery, and resolution.
Test the disk alert by temporarily increasing the threshold above actual free space, then restore the final 15% threshold.
Never fill the disk intentionally to trigger the alert.
11. Controlled Incident Plan
The team must schedule a controlled Jenkins outage of approximately three minutes.
Before the test:
1. Confirm no Jenkins build is running.
2. Record the current service status.
3. Confirm the exact Jenkins stop and restart commands.
4. Confirm monitoring and notifications are operational.
5. Agree on a maintenance window.
During the test:
1. Record the UTC time when Jenkins is stopped.
2. Record the first unsuccessful HTTPS probe.
3. Record alert firing and notification receipt.
4. Record acknowledgment.
5. Restart Jenkins after approximately three minutes.
6. Record the first successful probe.
7. Record alert resolution.
After the test:
1. Verify Jenkins HTTPS access.
2. Run a successful Jenkins pipeline.
3. Verify Gitea remains available.
4. Verify the Gitea Actions manual PDF workflow.
5. Restart Prometheus and Grafana individually without deleting persistent storage.
6. Confirm earlier time-series data, dashboard configuration, and alert rules persist.
7. Complete a blameless incident review.
8. Create two improvement issues with assigned owners.
The incident must not interrupt Gitea intentionally.
12. Rollback and Recovery Plan
Before deployment
* Record the existing running containers and versions.
* Identify current Compose projects, networks, mounts, and configuration locations.
* Confirm the recovery procedure for Gitea, Jenkins, and Caddy.
* Preserve existing application data and backups.
* Record the monitoring configuration commit.
* Confirm adequate capacity.
If monitoring deployment fails
1. Stop or remove only the newly introduced monitoring containers as appropriate.
2. Preserve Prometheus and Grafana persistent volumes.
3. Restore the previously verified monitoring configuration.
4. Confirm Gitea, Jenkins, and Caddy remain operational.
5. Verify external HTTPS access to Gitea and Jenkins.
6. Record the failure, corrective action, and result in the Gitea issue.
If an existing service is affected
1. Stop the monitoring rollout.
2. Identify the affected service and its current status.
3. Follow the service-specific recovery procedure.
4. Avoid deleting or recreating existing application data.
5. Verify HTTPS availability and application functionality.
6. Record the recovery timeline.
Rollback commands must be finalized against the actual Docker deployment before use.
13. Monitoring Failure Domain
If monitoring and monitored services run on the same Droplet, a complete Droplet outage may also disable Prometheus, Grafana, and alert delivery.
This is a shared failure domain.
The final incident review should recommend an independent external uptime check as a prioritized improvement.
14. Evidence and Traceability
The final manual must include:
* Approved deployment architecture and capacity decision.
* Pinned image versions and digests.
* Configuration validation results.
* Deployment commands and container status.
* Prometheus target and host-metric verification.
* HTTPS/TLS and external exposure checks.
* Six-panel Grafana dashboard.
* Jenkins build correlation.
* SLI/SLO calculations and actual observation results.
* Alert firing, notification, and resolution evidence.
* Controlled incident timeline and recovery verification.
* Persistence test results.
* Two improvement issues with owners.
* Reviewed Gitea commits and successful PDF workflow run.
Do not describe planned or untested behavior as verified.
15. Handoff Responsibilities
Turan — preparation: Architecture, proposed configuration, dashboard definitions, hypothetical calculations, alert and incident procedures, and initial manual documentation.
Sergio — implementation: Capacity approval, deployment, networking, security, persistence, live verification, alert testing, controlled incident, evidence collection, final manual updates, reviewed merge, and PDF submission.
Historical preparation checkpoint: Preparation only. Monitoring deployment and operational verification remain pending.
## Verified deployment checkpoint: October 30, 2026
The primary droplet (165.227.90.215) was resized with approval to 2 GiB RAM,
1 vCPU, retaining its 10 GB disk. A pre-resize snapshot is available as 252241628.
Current monthly resource prices: primary $12, second existing droplet $4,
5.65 GB retained snapshot approximately $0.34. No disk expansion was approved.
Monitoring is deployed separately at /opt/ssw590-monitoring. Grafana uses
https://metrics.165.227.90.215.sslip.io and authenticated login; no monitoring
container publishes a host port. Caddy configuration was backed up before reload.
Blackbox Exporter has private address 172.18.0.250 on gitea_default; only this
/32 was added to the existing Jenkins allowlist. It resolves both HTTPS names
to Caddy's inspected private address 172.18.0.3 using CADDY_PRIVATE_IP.
Verify that address after any Caddy recreation and recreate Blackbox if it changes.
This measures a private proxy route with real hostname/TLS verification, not
reachability from every external network. Whole-droplet failure also stops monitoring.
Pinned images: Prometheus v3.15.1, Grafana 13.3.0-slim, Node Exporter v1.12.1,
Blackbox Exporter v0.29.1. The full Grafana image and its unsolicited optional
plugin downloads consumed too much storage; only those new disposable artifacts
were removed. No application data or named volume was deleted. The slim image
needs only the Prometheus plugin, installed at 13.2.4 with:
docker compose exec grafana grafana cli plugins install prometheus 13.2.4
docker compose restart grafana
Optional plugin preinstallation and updates are disabled. Provisioning directories
must be mode 755 and non-secret provisioning files mode 644 so UID 472 can read them.
Keep .env mode 600 and outside Git. Preserve its generated Grafana admin credential.
Required local settings: GRAFANA_ADMIN_PASSWORD, GRAFANA_ROOT_URL,
CADDY_PRIVATE_IP. Run docker compose config --quiet; never publish expanded config.
Prometheus retention is seven days or 512 MB of retained blocks, whichever is reached
first; WAL/head storage is additional. Monitor remaining disk and avoid large upgrades
without checking transient extraction space.
Runtime checks: all five scrape targets up=1, both HTTPS probe_success=1;
Grafana data source, six panels and two provisioned rules loaded. Root labels are
mountpoint=/, device=/dev/vda1, fstype=ext4. Node memory total 2063564800 bytes
matches the host. Dashboard screenshots, notification delivery, incident, pipeline,
persistence and final PDF evidence remain pending. A local preliminary PDF compiled,
but the automated workflow and glossary generation are not yet verified.
## Completed exercise evidence, 2026-10-30
The measured deployment and incident report is in `devopsSREMonitoring.tex`. Both real alert pairs were received in Discord. Jenkins recovery build 3 passed and published its matching success status to Gitea. The 10-minute exercise recorded 20/20 successful Gitea observations and 13/20 Jenkins observations. Separate Prometheus/Grafana restarts retained history and configuration. Human peer review and main merge remain deferred. Earlier preparation/checkpoint sections describe the rollout sequence, not final evidence status. See `evidence/chapter5/` for sanitized records.
## Final audit checkpoint, 2026-10-30
Automatic application polling discovered commit b39613b2d2869065cf363bff36a7b54225cb7438 and built/tested it successfully without a manual trigger. Grafana public /metrics was blocked with the validated versioned Caddyfile. The complete eight-section audit is in devopsSREMonitoring.tex; backup procedure in BACKUP-RECOVERY.md; updated runtime evidence under evidence/chapter5/. The user explicitly deferred global IPv4 SSH restriction. Human peer review remains pending and main stays unmerged. Earlier preparation sections are historical, not the final runtime status.