Chapter 6: Add production monitoring integration runbook (#10)
startup-product-ci/pipeline/head This commit looks good
startup-product-ci/pipeline/head This commit looks good
This commit is contained in:
@@ -0,0 +1,174 @@
|
||||
# Chapter 6 — Production Monitoring Integration
|
||||
|
||||
## Purpose
|
||||
|
||||
Extend the existing Chapter 5 monitoring infrastructure to observe the
|
||||
Startup Pricing Service's production HTTPS endpoint.
|
||||
|
||||
The monitoring configuration must preserve existing Gitea, Jenkins,
|
||||
Prometheus, Grafana, Node Exporter, and Blackbox Exporter functionality.
|
||||
|
||||
This document describes the required integration and verification.
|
||||
Actual implementation and evidence collection remain pending.
|
||||
|
||||
## Existing Infrastructure
|
||||
|
||||
The team previously deployed:
|
||||
|
||||
- Prometheus for metrics collection.
|
||||
- Grafana for dashboard visualization.
|
||||
- Node Exporter for host metrics.
|
||||
- Blackbox Exporter for HTTPS availability monitoring.
|
||||
- Caddy as the existing HTTPS reverse proxy.
|
||||
|
||||
Chapter 6 must reuse these services rather than deploy a second
|
||||
monitoring stack.
|
||||
|
||||
## Monitoring Target
|
||||
|
||||
The production application must expose:
|
||||
|
||||
- `https://REPLACE_PRODUCTION_HOSTNAME/health`
|
||||
|
||||
The endpoint must:
|
||||
|
||||
1. Use HTTPS with valid certificate verification.
|
||||
2. Return HTTP 200 when healthy.
|
||||
3. Return JSON containing `"status": "ok"`.
|
||||
|
||||
The final hostname must be confirmed from the actual deployment.
|
||||
|
||||
## Prometheus Integration
|
||||
|
||||
Add the production HTTPS endpoint to the existing Blackbox Exporter
|
||||
probe configuration.
|
||||
|
||||
Use the existing Blackbox Exporter service and its configured
|
||||
HTTPS-capable probe module.
|
||||
|
||||
Example Prometheus scrape configuration:
|
||||
|
||||
```yaml
|
||||
- job_name: pricing-production-https
|
||||
metrics_path: /probe
|
||||
params:
|
||||
module: [http_2xx]
|
||||
static_configs:
|
||||
- targets:
|
||||
- https://REPLACE_PRODUCTION_HOSTNAME/health
|
||||
relabel_configs:
|
||||
- source_labels: [__address__]
|
||||
target_label: __param_target
|
||||
- source_labels: [__param_target]
|
||||
target_label: instance
|
||||
- target_label: __address__
|
||||
replacement: blackbox-exporter:9115
|
||||
```
|
||||
|
||||
This is an example only. Adapt the job name, module, and exporter
|
||||
address to the existing Chapter 5 configuration.
|
||||
|
||||
Do not overwrite existing scrape jobs.
|
||||
|
||||
## Required Metrics
|
||||
|
||||
Verify the following:
|
||||
|
||||
| Metric | Purpose |
|
||||
|---|---|
|
||||
| `probe_success` | Whether the production HTTPS probe succeeds |
|
||||
| `probe_http_status_code` | HTTP response status |
|
||||
| `probe_duration_seconds` | Probe execution duration |
|
||||
|
||||
Confirm that the production target appears in Prometheus and
|
||||
that the probe is returning valid results.
|
||||
|
||||
## Grafana Integration
|
||||
|
||||
Extend the existing Chapter 5 dashboard.
|
||||
|
||||
Add a clearly labeled production application panel showing:
|
||||
|
||||
- Production HTTPS availability.
|
||||
- Probe status over time.
|
||||
- Relevant release and rollback timestamps.
|
||||
|
||||
Do not remove or replace existing dashboard panels.
|
||||
|
||||
## Release Correlation
|
||||
|
||||
Record the following events:
|
||||
|
||||
1. Initial v1 production deployment.
|
||||
2. v2 production promotion.
|
||||
3. Healthy v2-to-v1 production rollback.
|
||||
4. Recovery verification completion.
|
||||
|
||||
For each event, record:
|
||||
|
||||
- Event timestamp.
|
||||
- Application version.
|
||||
- Immutable image digest.
|
||||
- Jenkins build or deployment reference.
|
||||
- Observed production HTTPS probe status.
|
||||
|
||||
Compare the deployment timeline with the monitoring timeline.
|
||||
|
||||
## Staging Failure Demonstration
|
||||
|
||||
The controlled configuration failure must occur in staging only.
|
||||
|
||||
The existing production monitoring target should remain healthy
|
||||
throughout the staging exercise.
|
||||
|
||||
If production monitoring changes unexpectedly, investigate and
|
||||
document the cause rather than assuming the failure is isolated.
|
||||
|
||||
## Verification Procedure
|
||||
|
||||
1. Confirm existing Chapter 5 monitoring services are operational.
|
||||
2. Record the current Prometheus targets and Grafana dashboard.
|
||||
3. Add the production pricing HTTPS target.
|
||||
4. Validate the Prometheus configuration before applying it.
|
||||
5. Reload or restart only the required monitoring component.
|
||||
6. Verify that all preexisting monitoring targets remain present.
|
||||
7. Confirm that the production pricing target reports successful probes.
|
||||
8. Open the updated Grafana dashboard.
|
||||
9. Capture screenshots showing the new monitoring data.
|
||||
10. Record actual release and rollback timestamps.
|
||||
11. Correlate those timestamps with the monitoring results.
|
||||
|
||||
## Evidence Checklist
|
||||
|
||||
- [ ] Existing Chapter 5 monitoring baseline captured.
|
||||
- [ ] Production HTTPS probe configuration recorded.
|
||||
- [ ] Prometheus configuration validation passed.
|
||||
- [ ] Existing monitoring targets preserved.
|
||||
- [ ] New production probe visible in Prometheus.
|
||||
- [ ] New production panel visible in Grafana.
|
||||
- [ ] v1 deployment timestamp recorded.
|
||||
- [ ] v2 deployment timestamp recorded.
|
||||
- [ ] Production rollback timestamp recorded.
|
||||
- [ ] Monitoring behavior correlated with release events.
|
||||
- [ ] Supporting screenshots saved.
|
||||
|
||||
## Limitations
|
||||
|
||||
The production application and monitoring infrastructure run
|
||||
on the same DigitalOcean Droplet.
|
||||
|
||||
This introduces a shared failure domain.
|
||||
|
||||
A Droplet outage may simultaneously affect the application and
|
||||
the monitoring services, preventing reliable external outage
|
||||
detection.
|
||||
|
||||
The monitoring exercise demonstrates application observability,
|
||||
not independent monitoring infrastructure or high availability.
|
||||
|
||||
## Status
|
||||
|
||||
Monitoring integration procedure prepared.
|
||||
|
||||
Sergio must implement the configuration, verify the target,
|
||||
update the dashboard, and collect actual evidence.
|
||||
Reference in New Issue
Block a user